[{"id":"367","ADate":"12\/9\/2024","AText":"Rider Alert: Blue Line Bus Bridge on January 2 and 9, 2025","ANotes":"
Due to construction at the Watt\/I-80 Transit Center, a bus bridge (shuttle bus between stations) will be in place on the Blue Line on Thursday, January 2 and January 9, 2025, from 8 p.m. until the end of service between Roseville Road and Watt\/I-80 stations.<\/p>\n\n
Blue Line Shuttle Bus Service<\/strong><\/u><\/p>\n\n Thursday, January 2, 2025:<\/strong>\n Shuttle Bus Locations: <\/strong><\/p>\n\n Roseville Road Bus Service<\/u>\n Watt\/I-80 West Bus Service<\/u>\n Watt\/I-80 Bus Service<\/u>\n Visit sacrt.com\/WattI80<\/a> or call 916-321-BUSS (2877) for details.<\/p>","AType":"1"},{"id":"366","ADate":"12\/6\/2024","AText":"Rider Alert: Bus Service Adjustments Begin January 5, 2025","ANotes":" Bus Service Adjustments Begin January 5, 2025<\/strong><\/p>\n\n Effective Sunday, January 5, 2025, SacRT will implement service changes for bus routes 19, 23, 61, 88, 103, 106 and 129.<\/p>\n\n \n \nRoute 19 (Rio Linda):<\/b> The bus layover location will be moved to provide a safer environment. The terminus of bus route 19 will be relocated to the southbound stop on Watt Avenue at Elverta Road. In addition, the bus will travel along the outbound direction (toward Black Saddle Drive) instead of the inbound direction (toward Arden\/Del Paso Station). Two minutes have been added to the outbound direction and two minutes have been removed from the inbound schedule. \n\n \n\n Route 23 (El Camino):<\/b> Departure times from Arden\/Del Paso Station will shift one minute later to improve connections. All trip times will shift accordingly. \n\n Route 61 (Fruitridge):<\/b> To provide a better connection with students at West Campus High School, the 3:12 p.m. trip from Florin Town Centre will depart five minutes later at 3:17 p.m. All times will shift accordingly. \n\n Route 88 (West El Camino):<\/b> Departures from J & 11th streets will shift four minutes earlier to improve connections at Arden\/Del Paso Station. All trip times will shift accordingly. <\/p>\n\n Route 103 (Riverside Express):<\/b> Certain trips will be extended to serve the new State of California office building located at 7th Street & Richards Boulevard. <\/p>\n\n Route 106 (Land Park Commuter):<\/b> Certain trips will be extended to serve the new State of California office building located at 7th Street & Richards Boulevard. <\/p>\n\n Route 129 (Arden Commuter):<\/b> Certain trips will be extended to serve the new State of California office building located at 7th Street & Richards Boulevard. <\/p>\n\n Visit sacrt.com\/servicechanges to view the new schedules or call 916-321-BUSS (2877). ","AType":"1"},{"id":"359","ADate":"11\/22\/2024","AText":"Rider Alert: Holiday Schedule May Impact Service","ANotes":" Please be aware of special holiday schedules for SacRT service this season.<\/p>\n\n Christmas Day<\/strong> Date:<\/strong> Wednesday, December 25<\/p>\n\n New Year\u2019s Day<\/strong> Date:<\/strong> Wednesday, January 1, 2025<\/p>\n\n Martin Luther King Jr. Day<\/strong> Date:<\/strong> Monday, January 20, 2025<\/p>\n\n For more information, visit sacrt.com\/holidayservice<\/a>.<\/p>","AType":"1"},{"id":"358","ADate":"11\/15\/2024","AText":"Rider Alert: Natomas Bus Stop Temporarily Relocated","ANotes":" Effective through December 2024, the bus stop located on Truxel Road at Natomas Crossing Drive (in front of the In-Shape\/Family Fitness) that serves SacRT bus routes 11 and 13, will be temporarily moved south due to construction activity.<\/p>\n\n For trip planning assistance call 916-321-BUSS (2877). <\/p>","AType":"1"},{"id":"259","ADate":"11\/5\/2024","AText":"8th & Capitol Light Rail Station Lift Out of Service","ANotes":"Due to a mechanical issue, the wheelchair and mobility device lift at the 8th & Capitol Station is currently out of service. SacRT is working to replace the lift, with installation expected to begin early 2025. \n\nIn the meantime, passengers needing accessible boarding via the E&H ramp can use nearby stations with accessible platforms: 9th & K Station (Blue Line towards Watt\/I-80) and 8th & K Station (Green Line towards 7th & Richards\/Township 9 or Gold Line towards Sacramento Valley Station). \n\nFor assistance, please contact SacRT at 916-321-BUSS (2877).","AType":"2"},{"id":"352","ADate":"10\/24\/2024","AText":"Rider Alert: 8th & K Bus Stop Temporarily Closed","ANotes":" Due to sidewalk construction, the bus stop at 8th & K (EB) will be closed from Monday, November 11 through Monday, November 18, 2024. This impacts bus routes 11, 51, 102, 106, 109, 129 and 134. <\/p>\n\n Please use alternative bus stops at 8th & I streets (NB) or 8th Street & Capital Ave (NB). <\/p>\n\n For trip planning assistance call 916-321-BUSS (2877). <\/p>","AType":"1"},{"id":"355","ADate":"10\/22\/2024","AText":"Rider Alert: Temporary Relocation for UCD Express 137 Bus Stop through January 31, 2025","ANotes":" Starting Monday, November 4, 2024, the UCD Express 137 bus stop located at 45th Street between Y Street and 2nd Avenue will be temporarily relocated to Stockton Blvd north of 2nd Avenue (Northbound) due to ongoing construction.<\/p> \n\n This change will impact the Elk Grove\/UC Davis Medical Center Express Bus (Route 137). Construction has been extended to last through January 31, 2025.<\/p> \n\n For more information or assistance, please call 916-321-BUSS (2877).<\/p>","AType":"1"},{"id":"353","ADate":"10\/7\/2024","AText":"Rider Alert: Folsom Area Bus Bridge Extended Into December","ANotes":" SacRT is making significant construction progress in adding a passing track at the Glenn\/Robert G. Holderness Station to be able to provide 15-minute light rail service to all Folsom area stations including Hazel, Iron Point, Glenn\/Robert G. Holderness and Historic Folsom.<\/p>\n\n However, Folsom area light rail customers can expect light rail service disruptions and bus bridges to continue between Iron Point and Historic Folsom stations through December 2024.<\/p>\n\n Note: The schedule can change depending on weather and other factors.<\/p>\n\n Learn more at sacrt.com\/Folsom15.<\/a><\/p>","AType":"1"},{"id":"349","ADate":"9\/1\/2024","AText":"Rider Alert: Several Auburn Blvd Bus Stops Temporarily Closed","ANotes":" Several bus stops along Auburn Blvd in Citrus Heights are temporarily closed due to the Auburn Boulevard Complete Streets Project.<\/p>\n\n The following bus stops are closed:<\/b><\/p>\n The nearby bus stop options for these closed stops are located on Auburn Blvd and Sycamore Dr. or at the Louis & Orlando Transit Center.<\/p>\n\n The bus stop closures are expected to last through February 2025.<\/p> \n\n Learn more about the project at https:\/\/www.citrusheights.net\/1127\/Auburn-Boulevard-Complete-Streets-Phase-. <\/a><\/p>","AType":"1"},{"id":"347","ADate":"8\/21\/2024","AText":"Rider Alert: Bus Stop Closure 7th & J Street","ANotes":" The bus stop at 7th & J Street is closed as of Monday, August 26, 2027 due to road repairs. Riders should use the bus stop at 7th & I Street until the roadwork in complete. <\/p>\n\n For assistance call 916-321-BUSS (2877).<\/p>","AType":"1"},{"id":"346","ADate":"8\/19\/2024","AText":"Rider Alert: Select Elk Grove Bus Stops Closed Beginning Wednesday, August 21","ANotes":" Starting Wednesday, August 21, 2024, four Elk Grove Transit Services bus stops will be impacted due to a street closure on Franklin Blvd in Elk Grove.<\/p>\n\n All northbound bus stops on Franklin Blvd between Laguna Blvd and Laguna Park are impacted. The routes include 12, 14, 112 and 114. The southbound stops will not be impacted during the street closure.<\/p>\n\n Here are the impacted stops and the next closest bus stops:<\/b>\n The closures are expected to last through the end of 2024. For trip planning assistance, please contact SacRT Customer Service at 916-321-BUSS (2877). <\/p>","AType":"1"},{"id":"344","ADate":"7\/31\/2024","AText":"Rider Alert: New Low-Floor Light Rail Vehicles in Service on the Gold Line","ANotes":"SacRT introduced into service the new low-floor light rail vehicles on the Gold Line on Sunday, September 1, 2024. \n\n\n*Please note that construction to add a passing track to provide 15-minute service frequency to Folsom area stations is still ongoing. Once construction is complete, the new low-floor trains will operate on the Gold Line between Sacramento Valley Station and Historic Folsom Station. \n\nSacRT is operating both low-floor and high-floor trains as we complete the final testing phase of the new trains. \n\nThe Blue Line will continue to operate our current high-floor light rail trains, which still require riders in mobility devices and those unable to climb stairs to use the mini-high ramps at the end of the station platforms. \n\nVisit sacrt.com\/newtrains<\/a> for details or call 916-321-BUSS (2877). ","AType":"1"},{"id":"343","ADate":"7\/24\/2024","AText":"Rider Alert: CRC Platform Closure","ANotes":"Due to needed track repair. All passengers boarding and exiting at Cosumnes River College Station please use the platform closest to Bruceville Road. Trains will not service the platform closest to the bus stops and parking lot. If you need assistance, please contact 916-321-BUSS (2877).","AType":"1"},{"id":"342","ADate":"7\/16\/2024","AText":"Rider Alert: Construction at Watt\/I-80 Transit Center","ANotes":" Construction is underway on a variety of improvements on the Watt\/I-80 Transit Center that will help create a safer, more accessible environment at one of the region\u2019s largest transit hubs. <\/p> \n\n The next phase of construction began on December 3, 2024 at the Watt\/I-80 Transit Center. The SacRT bus stop located on the southbound side of Watt Avenue (upper level) is temporarily closed due to construction activity on Watt Avenue. The bus routes affected include 1, 26, 84 and 93. Riders can catch the bus at an existing bus stop (in front of Red Roof Inn) located further down Watt Avenue toward Longview Drive.<\/p>\n \n To access the temporary bus stop from the light rail station: Take the northbound stairs or elevator to Watt Avenue, turn left down Watt Avenue and follow the pedestrian detour signs to cross Watt Avenue at the crosswalk. The temporary bus stop is in front of the Red Roof Inn. <\/p>\n \n During this stage of construction, the southbound elevator and stairs are closed during construction. Riders can use the northbound elevator or stairs to get to the upper level. The northbound bus stop is not impacted at this time. This stage of construction is expected to last into May 2025. <\/p>\n\n\n The Watt\/I-80 Transit Center Improvement Project includes widening of the Watt Avenue Bridge, construction of an open-air stairwell linking Watt Avenue and the transit center, a new bus\/pedestrian plaza, improvements to I-80 on-ramps, and upgrades to the portion of the transit center located beneath Watt Avenue. Collectively, these improvements will help attract more riders, accommodate additional bus service from other regional operators, and enhance the overall safety of the transit center. <\/p>\n\n Riders can expect temporary modifications in bus service during periods of construction, and drivers commuting to the transit center for bus or light rail service may also experience brief delays due to lane closures.<\/p>\n\n The project is expected to be completed in early 2026. <\/p>\n\n Learn more at sacrt.com\/WattI80<\/a> or call 916-321-BUSS (2877). <\/p>","AType":"1"},{"id":"340","ADate":"5\/21\/2024","AText":"Arden\/Del Paso Parking Lot Closed","ANotes":"The Arden\/Del Paso park-and-ride lot closed in July 2014 for approximately two years due to construction of an affordable housing development adjacent to the lot. On street parking will be available or riders can park at Globe or Swanston stations.","AType":"1"},{"id":"336","ADate":"5\/16\/2024","AText":"Rider Alert: Station Platform Changes","ANotes":" Station platform construction on the Gold Line is complete and SacRT began construction on the Blue Line platforms. SacRT is reminding riders to watch their step and keep their eyes focused when walking in the station as the platforms have been raised to meet the height requirement of the new low-floor light rail trains. Riders are urged to cross the stations at the ends of each platform and not in the middle of the station. <\/p>\n\n Learn more about the Light Rail Modernization Project at sacrt.com\/modernization.<\/a><\/p>","AType":"1"},{"id":"293","ADate":"8\/28\/2023","AText":"Cosumnes River College Station New Parking Information","ANotes":"UPDATED September 1, 2023 \n\nCRC daily parking passes are $2 per day from the parking pass machines at the college. A monthly pass for the CRC park-and-ride lot can be purchased from SacRT for $20. The monthly pass can be purchased in two ways: \n\nOption 1<\/b> \nIn-person at the SacRT Customer Service and Sales Center (cash or card) \n1225 R Street, Sacramento 95812 (adjacent to the 13th Street light rail station) \nMonday through Friday, 8:30 a.m. to 5 p.m. \n\nOption 2<\/b> \nBy phone: 916-321-2849. Please leave a message and SacRT staff will call you back to collect card payment and mail the pass. Please allow 5 - 7 business days to receive your pass from the time you call.","AType":"1"},{"id":"283","ADate":"5\/17\/2023","AText":"Sacramento Valley Station light rail ADA ramp closed to passengers exiting train at station","ANotes":" The Sacramento Valley Station (SVS) ADA ramp for arriving trains (inbound) is out of service. Customers traveling to SVS who need to use the ADA ramp to exit the train will instead need to exit using the ADA ramp at the 8th & H light rail station. A bus bridge (shuttle bus service) is available to riders that need to use the ADA ramp and travel to SVS. The shuttle bus pick-up location is at 8th & H bus stop (northbound), which is across the street from the 8th & H Station. Customers departing Sacramento Valley Station can board at the outbound ADA ramp.<\/p>\n\n For customers that need assistance, please call 916-321-BUSS (2877). <\/p>","AType":"1"},{"id":"276","ADate":"5\/1\/2023","AText":"Blue Line North Bus Bridge Monday - Friday","ANotes":" A bus bridge (shuttle buses) is in place on the Blue Line between Watt\/I-80 and Royal Oaks stations due to new low floor train testing.<\/p>\n\n Bus bridge (shuttle bus) operate between Watt\/I-80 and Royal Oaks stations Monday through Friday. The first trip will start at 11 p.m. and the last trip will depart at 1 a.m. The shuttles will be available every 30 minutes.<\/p>\n\n Testing is expected to last through summer 2024.<\/p>\n\n More information is available at https:\/\/www.sacrt.com\/apps\/blue-line-north-bus-bridges-for-train-testing-in-may\/.<\/a><\/p>\n\n\n
\n
\n